Plastering method for building engineering

建筑工程抹灰方法

  • Inventors: WU XUEKONG
  • Assignees: 吴学孔
  • Publication Date: January 24, 1987
  • Publication Number: CN-86104516-A

Abstract

本发明属于建筑施工抹灰方法,特别适用于砖混结构建筑物的抹灰工程。其特点是采用专门设计的组合尺板定位找平,代替现有技术中拉线找平、做灰饼、冲筋等复杂工序进行平面(墙面、地面、顶棚等),洞口(门窗口、井口等)、凸檐(雨罩、阳台、柱垛、过梁、腰线、门窗套等)抹灰,使抹灰工艺发生了变革,在提高抹灰面层平整度的同时,还可大大提高工效,缩短工期。
The present invention is particularly applicable to plastering engineering for brick-concrete mixed building. Its features are: using special combined plate ruler to set and to screed in place of such complex processes in prior art as pulling wire for screeding, making screed, to plaster for plane (faces of wall, floor and ceiling), cavity (doorway and hatch, the opening of a well etc.), projected eaves (hood, balcony, buttress, lintel, frame, jamb etc.), and thereby a transformation is caused in plastering process. While it can improve smoothness of the plastered face, it can greatly increase work efficiency and reduce work hours.

Claims

Description

Topics

Download Full PDF Version (Non-Commercial Use)

Patent Citations (0)

    Publication numberPublication dateAssigneeTitle

NO-Patent Citations (0)

    Title

Cited By (9)

    Publication numberPublication dateAssigneeTitle
    CN-102162291-AAugust 24, 2011何玉成一种标定抹灰层厚度进行抹灰的方法及组合定位构件
    CN-102162291-BApril 27, 2016何玉成一种标定抹灰层厚度进行抹灰的方法及组合定位构件
    CN-102168482-AAugust 31, 2011何玉成Method for calibrating construction reference of plastering layer and combined member
    CN-102168482-BDecember 09, 2015何玉成一种标定抹灰层施工基准的方法及组合构件
    CN-103321393-ASeptember 25, 2013中冶交通(沈阳)建设工程有限公司, 中冶交通工程技术有限公司Interior wall plastering construction method
    CN-103321393-BJanuary 20, 2016中冶交通(沈阳)建设工程有限公司, 中冶交通工程技术有限公司内墙抹灰施工方法
    CN-103899075-AJuly 02, 2014东莞市建之都建设工程有限公司Construction ruler and construction method for recycling mortar and calibrating plaster layer construction datum
    CN-103899075-BFebruary 01, 2017东莞市建之都建设工程有限公司一种砂浆回收及标定抹灰层施工基准的施工方法及施工尺
    CN-104481119-AApril 01, 2015刘昌亚Splicing-type splayed screed